01The information file: every project’s starting point
Before a single drawing, you obtain an information file from the authority. It consolidates everything allowed on the plot: land designation, building percentages, number of stories, height, building lines, and the spatial guidelines from the applicable zoning plans, and it sets the threshold conditions up to the permit.
The file is delivered within 30 working days and is valid for two years. This is effectively where the buildable envelope is set, so a proper feasibility check at this stage prevents designing on rights that do not exist.
- Consolidates rights, uses, building lines, and guidelines
- Delivered within 30 working days, valid for two years
- Sets the threshold conditions for submission
- The basis for feasibility before any commitment